Wednesday, August 19, 2026
  • Subscribe
  • Advertise
  • Advertising Specifications
  • Editorial
  • Editorial Features
  • About Us
  • Contact
Networking+
  • Latest News
  • Magazine Topics
  • Technologies
  • Magazine Issues
No Result
View All Result
  • Latest News
  • Magazine Topics
  • Technologies
  • Magazine Issues
No Result
View All Result
Networking+
No Result
View All Result
Home Magazine Case Studies

Improved data centre resilience and efficiency is a cool outcome from Schneider Electric upgrade at University College Dublin

June 7, 2023
Reading Time: 2 mins read
Improved data centre resilience and efficiency is a cool outcome from Schneider Electric upgrade at University College Dublin
Share on LinkedInShare on Twitter


University College Dublin (UCD) is the largest university in Ireland, with a total student population of about 33,000. The main campus at Belfield, Dublin is served by two on-premises data centres that support all the IT needs of students, faculty, and staff, including high-performance computing (HPC) clusters for computationally intensive research. The main data centre in the Daedalus building, hosts all the centralised IT including storage, virtual servers, identity and access Management, business systems, networking, and network connectivity in conjunction with a smaller on-premises data centre.

Ageing cooling infrastructure presents downtime threat and reputational damage

Resilience is a key priority for UCD’s IT Services and with its campus located close to Dublin’s city centre, real estate is at a premium. There are continuing demands for more student facilities and consequently the need to make more efficient use of space by support services such as IT. Finally, there is a pervasive need to maintain services as cost-effectively as possible and to minimise environmental impact in keeping with a general commitment to sustainability.

As part of a major strategic development of the university’s facilities called Future Campus, the main Daedalus data centre was required to free up some outdoor space taken up by a mechanical plant and make it available for use by another department. The IT Services organisation took this opportunity to revise the data centre cooling architecture to make it more energy and space efficient as well as more resilient and scalable.

One challenge with the chilled water system was that it relied upon a single set of pipes to supply the necessary coolant, which therefore represented a single point of failure. Any issues encountered with the pipework, such as leaks, could therefore threaten the entire data centre with downtime. This could create problems at any time in the calendar, however, were it to occur at critical moments such as during exams or registration it would have a big impact on the university community.

Migration to Schneider Electric Uniflair InRow DX Cooling Solution

UCD IT services opted to replace the existing chilled water-based cooling system with a new solution utilising Schneider Electric’s Uniflair InRow Direct Expansion (DX) technology, utilising a refrigerant vapour expansion and compression cycle. The condensing elements have been located on the roof of the data centre, conveniently freeing up significant ground space on the site formerly used for a cooling plant.

UCD selected Total Power Solutions, a Schneider Electric Elite Partner, to deliver the cooling update project. Working together with Schneider Electric, Total Power Solutions was responsible for the precise design of an optimum solution to meet the data centre’s needs and its integration into the existing infrastructure…

Read the full story here

Related Posts

MLL delivers Social Value at East Sussex County Council
Magazine

MLL delivers Social Value at East Sussex County Council

August 13, 2026
Former Chief of Joint Operations Sir David Capewell partners with Vodafone Business 
Magazine

Former Chief of Joint Operations Sir David Capewell partners with Vodafone Business 

May 20, 2026
High-profile filings prove world’s biggest stars will not wait for AI legislation
Magazine

High-profile filings prove world’s biggest stars will not wait for AI legislation

April 29, 2026
CableFree: 30 Years of Wireless Excellence and Innovation
Features

CableFree: 30 Years of Wireless Excellence and Innovation

April 21, 2026

Subscribe

Get the latest networking news and insights delivered to your inbox.

SIGN UP

READ THE LATEST ISSUE

Networking+ is the premier independent resource for communications, network, IT, and data centre professionals. We provide an in-depth look at the rapidly evolving digital infrastructure landscape, covering everything from fixed and wireless LANs to complex enterprise WANs and MANs across both the public and private sectors.

By delivering breaking news, expert analysis, and strategic insights across our print publication, website, and e-newsletters, Networking+ offers a powerful, ‘one-stop’ media combination. Our multi-channel platform is dedicated to keeping industry decision-makers connected, informed, and equipped to future-proof their networks.

Follow Us

Content

  • Magazine
  • Technologies
  • Subscribe
  • Editorial
  • Advertise
  • About Us
  • Features List
  • Privacy Policy
  • Cookies Policy
  • Terms & Conditions

© 2026 Networking+ - A Denyan Media Ltd Publication.

No Result
View All Result
  • Latest News
  • Magazine Topics
  • Technologies
  • Magazine Issues
  • Advertise
  • Advertising Specifications
  • Editorial
  • Editorial Features
  • About Us

© 2026 Networking+ - A Denyan Media Ltd Publication.

We use cookies to analyse site traffic and improve your experience with the latest enterprise networking insights. By clicking 'OK', you consent to our use of cookies in accordance with our Privacy Policy.